Showcasing Schach’s Superior Engineering Efficiency
The Navkar G Building project in Naigaon showcases the efficiency and performance of Schach’s Aluminium Monolithic Formwork System. Spread across 4,200 sqm, the project has achieved rapid and consistent progress with smooth execution of each slab cycle.
Our Aluminium Formwork enabled faster construction by casting walls and slabs together in a single operation, ensuring high structural accuracy, uniformity and minimal rework. The lightweight yet durable panels allowed quick assembly and dismantling, supporting repeated use with precision.
With reduced dependency on multiple trades and significantly lower wastage, Schach’s system has delivered a streamlined, cost effective and high-quality construction process, demonstrating how advanced formwork technology drives real on-site results.